Project Title: Construction of Drainage at Hunsur K-Village
Project Location: Hunsur Rabgayling Tibetan Settlement
Total Cost of Project: ₹37,97,500/-(Rupees Thirty Seven Lakh Ninety Seven Thousand Five Hundred only)
Funded by: Fund raised by Settlement, TTF and OSSO
Work Period: 17th September, 2025 to 13th November, 2025
Project Description & Progress:
A cement concrete drainage system with a total length of 1,550 meters was constructed at K-Village to improve water management and sanitation. The work included laying M20 grade concrete for the raft and side walls, along with PCC work. Steel reinforcement of 10 mm × 8 mm was provided throughout the drainage system to ensure strength and durability. The drainage system covers the entire village and helps improve water flow, sanitation, and overall living conditions for the residents.
We extend our heartfelt gratitude to OSSO, The Tibet Fund, and the Settlement for their generous and vital support in making this project possible.