Here are the site activities summarized into two paragraphs:
The site was a flurry of activity from October 1st to November 4th, 2023, with labor working seven days a week from 8 am to 6 pm on the construction of a two-story building at the old age home in Chauntra. Significant progress was made during this period, with plumbing layouts completed (only accessories remaining), ground and first-floor bathroom wall and floor tiles finished, plastering work completed, and the roof instructions followed. The rainwater harvesting tank was also constructed, and the storeroom was finished, awaiting painting.
The wiring for the main layout on the first and ground floors was installed, with only the fittings left to be put in place. Door and jali installations were completed on these floors, leaving only the windows to be installed. Site development work progressed as well, with the construction of retaining walls around the road and water drainage systems. Additionally, work commenced on extending the boundary wall and constructing an open-air theater.