{"id":9779,"date":"2025-07-18T11:54:43","date_gmt":"2025-07-18T06:24:43","guid":{"rendered":"https:\/\/centraltibetanreliefcommittee.net\/?p=9779"},"modified":"2025-07-18T11:54:43","modified_gmt":"2025-07-18T06:24:43","slug":"reconstruction-of-stone-flood-barrier-and-collapsed-wall-185621","status":"publish","type":"post","link":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/2025\/07\/18\/reconstruction-of-stone-flood-barrier-and-collapsed-wall-185621\/","title":{"rendered":"Reconstruction of Stone Flood Barrier and Collapsed Wall 185*6*2*1"},"content":{"rendered":"<section class=\"l-section wpb_row height_medium\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p><strong>Project Title<\/strong>:\u00a0<u>Reconstruction<\/u> <u>of Stone Flood Barrier and Collapsed Wall 185*6*2*1<\/u><\/p>\n<p><strong>Location<\/strong>:\u00a0Sakya Tibetan Settlement, Puruwala<\/p>\n<p><strong>Completion Date<\/strong>:\u00a016th July 2025<\/p>\n<ol>\n<li><strong>Project Overview<\/strong><\/li>\n<\/ol>\n<p>Heavy rainfall on the night of September 25, 2024, resulted in significant damage to the retaining wall and bridge beam near the settlement office leaving a large hole and nearly causing the surrounding shops to fall. Furthermore, the open drainage system built inside the camp to prevent flooding was partially destroyed by the torrential rain. The project aimed to reconstruct a stone flood barrier and a collapsed wall with dimensions of 185*6*2*1 to prevent future flooding and ensure the safety of the settlement.<\/p>\n<ol start=\"3\">\n<li><strong>Project Details:<\/strong><\/li>\n<\/ol>\n<ul>\n<li>Donor: German Aid to Tibetans (GAT) through Department of Home (CTA)<\/li>\n<li>Property: Tibetan settlement Office<\/li>\n<li>Start Date:\u00a02<sup>nd<\/sup> June 2025<\/li>\n<li>Completion Date:\u00a016th July 2025<\/li>\n<li>Total Project Cost: INR 8,64,929.00<\/li>\n<li>Sponsor: GAT<\/li>\n<\/ul>\n<ol start=\"2\">\n<li><strong>Project Objectives<\/strong><\/li>\n<\/ol>\n<ul>\n<li>Reconstruct the stone flood barrier to withstand heavy rainfall.<\/li>\n<li>Repair the collapsed wall to prevent water ingress.<\/li>\n<li>Enhance the overall safety and resilience of the settlement against flooding.<\/li>\n<\/ul>\n<ol start=\"4\">\n<li><strong>Key Factors for Successful Completion<\/strong><\/li>\n<\/ol>\n<p><u>Favorable Weather Conditions<\/u>:\u00a0The project benefited from consistent and favorable weather, which facilitated uninterrupted construction activities.<\/p>\n<p><u>Surplus Labor<\/u>:\u00a0An adequate supply of labor ensured that the project progressed smoothly and was completed on schedule.<\/p>\n<ol start=\"5\">\n<li><strong>Challenges Faced<\/strong><\/li>\n<\/ol>\n<p><u>Heavy Rainfall<\/u>:\u00a0The project encountered challenges due to heavy rainfall. However the efficiency and the dedications of the team ensure the project was a resounding success.<\/p>\n<ol start=\"6\">\n<li><strong>Mitigation Measures<\/strong><\/li>\n<\/ol>\n<p><u>Immediate Response<\/u>:\u00a0Quick action was taken to reinforce temporary barriers and protect the settlement from immediate danger.<\/p>\n<p><u>Future Prevention<\/u>:\u00a0The reconstructed stone flood barrier and wall are designed to provide long-term protection against similar weather events.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<ol start=\"7\">\n<li><strong>Conclusion<\/strong><\/li>\n<\/ol>\n<p>The project was successfully completed on 13th July 2025, thanks to favorable weather conditions and surplus labor. The challenges posed by heavy rainfall at the end of August and the beginning of September 2024, the newly reconstructed flood barrier and wall have significantly enhanced the settlement&#8217;s resilience to flooding. This project stands as a testament to our commitment to ensuring the safety and well-being of the residents.<\/p>\n<p><strong>Acknowledgment<\/strong><\/p>\n<p>We extend our heartfelt gratitude to the German aid to Tibetans and team for their generous funding and continued assistance towards the overall development and wellbeing of the Tibetan community in exile as well as Department of Home, CTA, for their support in implementing this project.<\/p>\n<p>Prepared By:<\/p>\n<p>Tenzin Namgyal (Mr.)<\/p>\n<p>Puruwala Sakya Tibetan Settlement Officer<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-us_1000_500 wp-image-9782\" src=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Completion-of-drainage-renovation-375x500.jpg\" alt=\"\" width=\"375\" height=\"500\" srcset=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Completion-of-drainage-renovation-375x500.jpg 375w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Completion-of-drainage-renovation-225x300.jpg 225w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Completion-of-drainage-renovation-768x1024.jpg 768w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Completion-of-drainage-renovation-150x200.jpg 150w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Completion-of-drainage-renovation-540x720.jpg 540w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Completion-of-drainage-renovation-113x150.jpg 113w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Completion-of-drainage-renovation-75x100.jpg 75w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Completion-of-drainage-renovation.jpg 780w\" sizes=\"auto, (max-width: 375px) 100vw, 375px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-us_1000_500 wp-image-9783\" src=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Damage-to-the-drainage-caused-by-the-torrential-rain-375x500.jpg\" alt=\"\" width=\"375\" height=\"500\" srcset=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Damage-to-the-drainage-caused-by-the-torrential-rain-375x500.jpg 375w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Damage-to-the-drainage-caused-by-the-torrential-rain-225x300.jpg 225w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Damage-to-the-drainage-caused-by-the-torrential-rain-768x1024.jpg 768w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Damage-to-the-drainage-caused-by-the-torrential-rain-150x200.jpg 150w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Damage-to-the-drainage-caused-by-the-torrential-rain-540x720.jpg 540w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Damage-to-the-drainage-caused-by-the-torrential-rain-113x150.jpg 113w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Damage-to-the-drainage-caused-by-the-torrential-rain-75x100.jpg 75w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Damage-to-the-drainage-caused-by-the-torrential-rain.jpg 780w\" sizes=\"auto, (max-width: 375px) 100vw, 375px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-us_1000_500 wp-image-9784\" src=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Reconstruction-of-the-drainage-in-progress-375x500.jpg\" alt=\"\" width=\"375\" height=\"500\" srcset=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Reconstruction-of-the-drainage-in-progress-375x500.jpg 375w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Reconstruction-of-the-drainage-in-progress-225x300.jpg 225w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Reconstruction-of-the-drainage-in-progress-768x1024.jpg 768w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Reconstruction-of-the-drainage-in-progress-150x200.jpg 150w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Reconstruction-of-the-drainage-in-progress-540x720.jpg 540w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Reconstruction-of-the-drainage-in-progress-113x150.jpg 113w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Reconstruction-of-the-drainage-in-progress-75x100.jpg 75w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Reconstruction-of-the-drainage-in-progress.jpg 1200w\" sizes=\"auto, (max-width: 375px) 100vw, 375px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-us_1000_500 wp-image-9785\" src=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Renovation-project-midway-667x500.jpg\" alt=\"\" width=\"667\" height=\"500\" srcset=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Renovation-project-midway-667x500.jpg 667w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Renovation-project-midway-300x225.jpg 300w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Renovation-project-midway-1024x768.jpg 1024w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Renovation-project-midway-267x200.jpg 267w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Renovation-project-midway-960x720.jpg 960w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Renovation-project-midway-500x375.jpg 500w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Renovation-project-midway-150x113.jpg 150w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Renovation-project-midway-100x75.jpg 100w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2025\/07\/Renovation-project-midway.jpg 1600w\" sizes=\"auto, (max-width: 667px) 100vw, 667px\" \/><\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"excerpt":{"rendered":"Project Title:\u00a0Reconstruction of Stone Flood Barrier and Collapsed Wall 185*6*2*1 Location:\u00a0Sakya Tibetan Settlement, Puruwala Completion Date:\u00a016th July 2025 Project Overview Heavy rainfall on the night of September 25, 2024, resulted in significant damage to the retaining wall and bridge beam near the settlement office leaving a large hole and nearly causing the surrounding shops to...","protected":false},"author":1,"featured_media":9785,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[102],"tags":[],"class_list":["post-9779","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-completed-projects-2025"],"_links":{"self":[{"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/posts\/9779","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/comments?post=9779"}],"version-history":[{"count":1,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/posts\/9779\/revisions"}],"predecessor-version":[{"id":9786,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/posts\/9779\/revisions\/9786"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/media\/9785"}],"wp:attachment":[{"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/media?parent=9779"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/categories?post=9779"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/tags?post=9779"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}