{"id":12607,"date":"2026-09-28T14:39:08","date_gmt":"2026-09-28T09:09:08","guid":{"rendered":"https:\/\/centraltibetanreliefcommittee.net\/?p=12607"},"modified":"2026-09-28T14:49:29","modified_gmt":"2026-09-28T09:19:29","slug":"tdl-camp-5-road-and-drainage-construction","status":"publish","type":"post","link":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/2026\/09\/28\/tdl-camp-5-road-and-drainage-construction\/","title":{"rendered":"TDL CAMP 5 ROAD AND DRAINAGE CONSTRUCTION"},"content":{"rendered":"<section class=\"l-section wpb_row height_medium\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p><strong>TDL CAMP 5 ROAD AND DRAINAGE CONSTRUCTION<\/strong><\/p>\n<p><span>\u00a0<\/span><span>Project Title:\u00a0 Village 5 Drainage System Construction Work <\/span><\/p>\n<p><span>Report Date:\u00a0\u00a0\u00a0 31<sup>st<\/sup> July 2026 <\/span><\/p>\n<p><span>Grant Completion Date: 12<sup>th<\/sup> july<\/span> <span>2026 <\/span><\/p>\n<p><span>Funded by \u00a0&#8211; The Tibet Fund<\/span><\/p>\n<p><span>Fund total \u2013 8,70,000\/-<\/span><\/p>\n<p><span>\u00a0<\/span><strong>Project Description &amp; Progress:<\/strong><\/p>\n<p><span>\u00a0<\/span><span>The project focused on the construction of a proper drainage system in Dickyi larso Village 5 to improve stormwater management and prevent waterlogging during the monsoon season . <\/span><\/p>\n<p><span>This activities included excavation of drainage channels, laying concrete drains, construction of connecting outlets, site leveling, and final finishing to ensure effective water flow throughout the village.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><strong><span>BEFORE<\/span><\/strong><\/p>\n<p><span>\u00a0<\/span><span>The entire population of Village 5 benefited from the newly constructed drainage system, improving sanitation, safety, and overall living conditions for all residents regardless of gender.<\/span><\/p>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"w-image align_center\"><div class=\"w-image-h\"><img decoding=\"async\" width=\"456\" height=\"600\" src=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image002.png\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image002.png 456w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image002-228x300.png 228w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image002-152x200.png 152w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image002-380x500.png 380w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image002-114x150.png 114w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image002-76x100.png 76w\" sizes=\"auto, (max-width: 456px) 100vw, 456px\" \/><\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"w-image align_center\"><div class=\"w-image-h\"><img decoding=\"async\" width=\"454\" height=\"595\" src=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image001.png\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image001.png 454w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image001-229x300.png 229w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image001-153x200.png 153w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image001-382x500.png 382w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image001-114x150.png 114w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image001-76x100.png 76w\" sizes=\"auto, (max-width: 454px) 100vw, 454px\" \/><\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p><strong><span>AFTER<\/span><\/strong><\/p>\n<p><span>The major highlight of the project was the successful completion of a durable drainage network before the peak rainy season, significantly reducing water stagnation, improving public hygiene, and minimizing damage to roads and nearby residential areas.<\/span><\/p>\n<p><span>The community expressed sincere gratitude for making this essential infrastructure project possible.<\/span><\/p>\n<p><span>The project was a collaborative effort between the CTA home department , local community leadership and The Tibet Fund (TTF), which provided critical financial support of RS 8,70,000\/-<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<\/div><\/div><div class=\"w-image align_center\"><div class=\"w-image-h\"><img decoding=\"async\" width=\"612\" height=\"462\" src=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image005.png\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image005.png 612w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image005-300x226.png 300w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image005-265x200.png 265w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image005-500x377.png 500w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image005-150x113.png 150w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image005-100x75.png 100w\" sizes=\"auto, (max-width: 612px) 100vw, 612px\" \/><\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"w-image align_center\"><div class=\"w-image-h\"><img decoding=\"async\" width=\"404\" height=\"522\" src=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image004.png\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image004.png 404w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image004-232x300.png 232w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image004-155x200.png 155w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image004-387x500.png 387w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image004-116x150.png 116w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image004-77x100.png 77w\" sizes=\"auto, (max-width: 404px) 100vw, 404px\" \/><\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"w-image align_center\"><div class=\"w-image-h\"><img decoding=\"async\" width=\"406\" height=\"525\" src=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image003.png\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image003.png 406w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image003-232x300.png 232w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image003-155x200.png 155w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image003-387x500.png 387w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image003-116x150.png 116w, https:\/\/centraltibetanreliefcommittee.net\/wp-content\/uploads\/2026\/09\/image003-77x100.png 77w\" sizes=\"auto, (max-width: 406px) 100vw, 406px\" \/><\/div><\/div><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"excerpt":{"rendered":"TDL CAMP 5 ROAD AND DRAINAGE CONSTRUCTION \u00a0Project Title:\u00a0 Village 5 Drainage System Construction Work Report Date:\u00a0\u00a0\u00a0 31st July 2026 Grant Completion Date: 12th july 2026 Funded by \u00a0&#8211; The Tibet Fund Fund total \u2013 8,70,000\/- \u00a0Project Description &amp; Progress: \u00a0The project focused on the construction of a proper drainage system in Dickyi larso Village...","protected":false},"author":1,"featured_media":12613,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36],"tags":[],"class_list":["post-12607","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-settlement"],"_links":{"self":[{"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/posts\/12607","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/comments?post=12607"}],"version-history":[{"count":2,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/posts\/12607\/revisions"}],"predecessor-version":[{"id":12615,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/posts\/12607\/revisions\/12615"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/media\/12613"}],"wp:attachment":[{"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/media?parent=12607"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/categories?post=12607"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/centraltibetanreliefcommittee.net\/index.php\/wp-json\/wp\/v2\/tags?post=12607"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}